Building in Texas? Check for Oil and Gas Wells and Pipelines First

On one Texas property, the map shows a 42-inch pipeline and a well record marked “Canceled Location.” Here’s what a builder can learn from each before laying out a home, driveway, or pool.

Written by Avi

On a property near Lincoln, Texas, several mapped pipelines cross the lot. One is labeled 42 inches in diameter. In the same map view, a well record reads “Canceled Location.”

If you were planning a home and driveway there, those findings would lead to different questions. Where could the driveway cross the pipeline? Was a well ever drilled at the marked location? Checking both early can change the layout you show the homeowner and the work you include in a quote.

Check the property in FutureLot

Open a Texas property and review Special Considerations. The Oil & Gas Pipelines and Oil & Gas Wells layers use data from the Railroad Commission of Texas (RRC). FutureLot flags mapped pipelines and well surface locations on the parcel or within 100 feet of it. We use that distance to catch nearby records. Any required setback has to come from the rules that apply to the site.

Turn on the layers and compare the mapped features with the proposed house, pool, and construction access. The RRC describes its map locations as approximate. A blank area on the map can still contain buried lines.

If a pipeline is nearby, check the easement

A pipeline route is drawn as a line. The operator may have rights to use a wider strip of land to reach and maintain it. Ask for the recorded easement and the property survey, then review the proposed layout with the operator. Even if the house sits clear of the easement, the only practical route for a driveway or heavy equipment might cross it. That’s a conversation to have before you price the work.

If a well appears, look up its history

Start with the status attached to the point. On the Lincoln property, “Canceled Location” is a reason to check the file before assuming a well exists there. On another lot, you might see an active, inactive, or plugged well. If the distinction matters to your layout, use the well’s identifying number, called an API number, to look up the RRC records. A drilling application describes what the operator proposed. A plugging report (Form W-3) documents the work done to plug a well.

Before excavation, contact Texas811

When the project is ready for digging, the excavator must request a utility locate through Texas811 at least two business days in advance, excluding weekends and holidays. Confirm that each utility listed on the ticket has responded before work starts. If the work area includes a privately owned line, such as one running from the house to a pool heater, arrange a separate locate. This step applies even when the planning map looks clear.

Try it on a real lot